This is the property of the Daily Journal Corporation and fully protected by copyright. It is made available only to Daily Journal subscribers for personal or collaborative purposes and may not be distributed, reproduced, modified, stored or transferred without written permission. Please click "Reprint" to order presentation-ready copies to distribute to clients or use in commercial marketing materials or for permission to post on a website. and copyright (showing year of publication) at the bottom.

CONFIDENTIAL

Aug. 5, 1995

Construction
Single Family Dwelling

Confidential

Settlement –  $138,000

Judge

Norman Spellberg

Court

Contra Costa Superior


Attorneys

Plaintiff

H. Clyde Long


Defendant

Paul A. Pelosi

Kelly M. Wilson

Joseph Ryan

H.E. Christian Peeples

Thorsten J. Pray


Experts

Plaintiff

Robert J. Bossi
(technical)

Defendant

Jeffrey Beam
(technical)

Facts

In 1991, Plaintiffs purchased a new 4,200-square-foot single family dwelling from Defendant joint venture -- builder, architect, and investor. The purchase price was $590,000. Prior to the purchase, the home was inspected for the Plaintiffs by Defendant engineer home inspector. After the purchase, the building developed drainage problems. Plaintiffs settled the drainage claims with the builder's insurance carrier, with a release that excluded future structural and foundation claims. After drainage repairs were made, the building developed cracks and other signs of structural distress. The instant lawsuit was filed after investigation revealed faulty shear wall and pier design, and improperly installed or missing shear panels and connectors. Plaintiffs' engineers recommended that Plaintiffs vacate the building, and they did so in January of 1994.

Settlement Discussions

Offers and/or demands, exchanged prior to this result, were not disclosed.

Damages

Plaintiffs claimed $180,000 cost of repairs; $85,000 loss of beneficial use and moving expenses; $30,000 diminution in value; unspecified attorney fees and costs.

Result

The terms of this agreement included settlement of a concurrent declaratory relief action between the joint venture the builder, and 2 insurers.

Other Information

This case was filed on March 25, 1994; one year, two months and two weeks prior to this result.