This is the property of the Daily Journal Corporation and fully protected by copyright. It is made available only to Daily Journal subscribers for personal or collaborative purposes and may not be distributed, reproduced, modified, stored or transferred without written permission. Please click "Reprint" to order presentation-ready copies to distribute to clients or use in commercial marketing materials or for permission to post on a website. and copyright (showing year of publication) at the bottom.

CONFIDENTIAL

Apr. 12, 2001

Torts
Eminent Domain
Condemnation

Confidential

Settlement –  $4,100,000

Judge

Morris B. Jones

Court

L.A. Superior Central


Attorneys

Plaintiff

Karen M. Chang


Defendant

Edward G. Burg
(Manatt, Phelps & Phillips LLP)


Facts

The defendants owned and operated a metals recycling business which had been in business for 51 years,
including 33 years at its present location east of downtown. The defendants owned about half of the real
property on which the business was conducted, and leased the other half.
The plaintiff sought to acquire by eminent domain part of the property that defendants owned and all of the
property that defendants leased, for construction of a 20-mile grade separated railroad right-of-way from the
Ports of Los Angeles and Long Beach to rail yards in downtown Los Angeles.
As originally planned, the condemnation would have required defendants to shut down the business or move
elsewhere. The defendants were unable to find a suitable site to relocate. The defendants and plaintiff then
worked together to modify the condemnation.
The plaintiff agreed not to take the leased property and defendants agreed to allow additional property that it
owned to be taken for a temporary construction easement. This allowed the defendant to reconfigure its
operations and stay in business at its long-time location, working around the plaintiffÆs project and expanding
onto nearby land owned by the defendants but not previously used for the business.
As modified, the plaintiff acquired about one-half acre in fee and one-half acre in construction easements. The
reconfiguration required defendant to relocate certain equipment, prepare its expansion site for use in the
business, build a replacement office, and operate around the project construction for approximately two years.

Settlement Discussions

The plaintiff (condemnor) made a deposit of probable compensation in the amount of $1,985,440. The defendant (condemnee) made an initial settlement demand of $4.5 million. The parties agreed to a settlement of $4.1 million.

Other Information

The settlement was finalized approximately eight months after the action was filed.